Tuesday, November 20, 2012

Rock and Stuff

It doesn't seem like anything major is happening right now, but the little things continue to move along.  Here's what's going on right now...

Kyle is still working on the electrical.  It's taking a long time, but he's plugging away at it.  I'm sure he'll be even happier when it's done than I will be.  

The support for the fireplace is in.  Kyle also framed inside of it, it will be a  second small closet of sorts for A, since his room has the smallest closet.  The support will have a slab poured over it.  Then we'll wait until we sell our old house to actually put the fireplace in.  That will be really nice.

I love my front door...

The gas lines are all run.  We have a gas water heater and dryer and this gas line for the cooktop, and a gas line run to the patio for the BBQ grill.

The rock is getting close to being done. 

Close up of the rock- this is the east side of the house.  

Kyle put some supports down through the floor into the joists so that when he builds the stair railings, they're sturdy.

The trench for the water line got filled in, so we're waiting for one more utility to come and lay their line, then we'll be ready for the driveway (although I think we have to get the drywall delivered before we can pour the driveway, and we need to get the electrical done and have the 4-way inspection, and the insulation done before the drywall can come, so hopefully all that stuff happens soon while we have such nice weather.

Thursday, November 8, 2012

It's been awhile..

The water meter is in and the water line going to the house is down.  I'm not sure if it's actually connected up to the house yet or not...

We've had three or four different trenches dug up the entire length of the driveway.  It would have been nice if we could have just done one trench and been done with it, but all the different utilities needed their own trench apparently.  Now we're just waiting for gas or electric to come do their trench (I can't remember which one isn't done yet...).  Then we can cover everything up and be done digging up the driveway.

The rock guy has been prepping for putting the rock on.

The window came.

And were installed in an hour.  They were fast.  One window got broken during installation, so hopefully they come back and replace it soon.  There are two windows in the cooling chimney that we ordered from another company, so we could get them on an electric switch so we can open them by remote.  Cooling chimneys aren't very useful if you can't open the windows.

Just looking at the light coming through the windows makes me happy.  It was really warm in there even without the house being sealed up all the way.  The back corner was actually too warm.  That's why we have to have the layer of quickset and tile everywhere on the first floor- it will moderate the heat so it doesn't get too hot in the winter. I can't wait to see how it works, and if it affects our utility bills at all.

Kyle picked up the exterior doors, and Frank from our builder came and installed them.  This is the only one that was done when I walked home from school with CP.  This is the garage to outside door.  All the other doors are more interesting to look at.


The fire sprinkler people came and finished up in a day.  They still have to connect the system to the water source, but other than that, fire sprinklers are done.

Kyle finished framing the basement, including around all the hvac ducting.  

This is the shower for the guest bath, and in the background you can see my soaker tub.  Kyle's going to need it after all the work he's been doing.

They cut a floor in my living room and build a cement block wall to support the (future) fireplace.  It will all be covered up again, but it will be there down the road when we are ready to put in our fireplace.  

Kyle also ALMOST finished the roof.  He has to put a few pieces of flashing in, and shingle the top of the cooling chimney.  I think that's the plan for tonight, if he can get to it before it gets too dark..  Looks like rain and snow in the next few days, so hopefully he can get it all done.

The rock did get dropped off today, I'll have to go out and look later to see if they started putting it up.