Kyle finished up the electrical last week, and the next day, we had the 4-way inspection, and a few days later, the insulation was done. That same day, the drywall was delivered, and the framers came and covered the south wall with plywood (something to do with how much glass in on that wall).
These are all kind of out of order, but here's looking up into the cooling chimney. The exposed joists will be wrapped and painted to match the trim.
Standing in the kitchen, looking out to the living room. The dry wallers only did the ceilings on the first floor on saturday. Hopefully they'll come back on monday.
The garage ceiling. This picture also shows how the exterior wall insulation looks. It's a plastic sheet, then they punched holes in it and blew in some sort of cellulose fill. It's pretty cool. Interior walls have the regular pink batting. The insulators also sprayed foam in any cracks to seal the house up really well. Joints on plywood, electrical boxes. They were pretty thorough.