We got the solid surface/cultured marble bid for the window sills and the shower, but for them to do the shower, we had to dig out the gypcrete that wasn't supposed to be inside the shower. Kyle siad it came up pretty easily.
Last night (until past midnight), Kyle worked on tile in the master bathroom. We used the same tile as in the hall bath, but Kyle wanted to add a border around it to make it look a little fancier. He dry fit everything before laying it, and it really turned out nicely.
He also got started on the tub surround.
I really like the chair rail type tile.
No comments:
Post a Comment