Outside, the cement work is moving along. The front steps got framed up today. Hopefully that means a cement truck will come tomorrow. Kyle put light boxes and conduit into the cement for the raised beds on the sides of the steps, it's going to look really nice.
The cultured marble place came out and did the master bath shower (it's two sided, so this is half the shower) and all the windowsills. (There's the trim piece on the floor that hadn't been installed yet when I took this picture.)
The Floor Saver pan that I ordered came, so I stuck it in place. It sits under the dishwasher and directs any water to the front, so that leaks are discovered immediately.
The window over the tub has two sills. The big one and the little one right around the window. They look really good. I highly recommend cultured marble window sills. So much easier to clean than wood, and they just look so good.
This is where the cement pad for our camper will be. I was really pleased to see this tube attached to the down spout. We hadn't talked about doing that, but it makes so much more sense when you're pouring cement to channel the water underground instead of having it run across the top of your driveway or whatever.
I just caught up on a the last several posts, and WOW! Everything looks so great. I love the tile and I may or may not be throwing a tiny jealous fit right now about your master bathroom. I can't wait to see it all in person when it's done!
ReplyDelete