Thursday, September 6, 2012

Basement Concrete

Bright and early at 7am - it took them 2 hours to pour and get to the next picture.

 This was at 5 the same day.  The middle inset is our mechanical room.  It is inset so if there is a pipe break, it won't flood our entire basement - the water will be contained in that room.


No comments:

Post a Comment