Electricity and (a little) painting

We have a power meter.

This is the only time is will read 00000, because today Kyle hooked up the furnace and a couple of plugs, so now our furnace isn't being run off of an extension cord from my parents house.

Because we're so far away from the street we have this (box in the ground) transformer.

Kyle wired two plugs in the storage room so that we could plug in a vacuum, a light and a radio.  The two lights show that it's wired correctly.  Phew.

Vacuuming the dirt in the storage room.

First coat of paint in the storage room.

Hopefully two coats will do it.  The cement is pretty bumpy.

In other news, the drywall is done, and we've met with the finish carpenter.  He'll have a bid for us by tuesday, and after he gets started he'll be done in three days.  Then we can paint everything, and lay tile.   After several days of snow, it cleared up today, and I stood in the house in front of the windows and enjoyed the warmth.  I could almost picture being moved in, it's getting closer.

Sunday, December 16, 2012

Insulation and Drywall

Kyle finished up the electrical last week, and the next day, we had the 4-way inspection, and a few days later, the insulation was done.  That same day, the drywall was delivered, and the framers came and covered the south wall with plywood (something to do with how much glass in on that wall).  


These are all kind of out of order, but here's looking up into the cooling chimney.  The exposed joists will be wrapped and painted to match the trim.


Standing in the kitchen, looking out to the living room.  The dry wallers only did the ceilings on the first floor on saturday.  Hopefully they'll come back on monday.  



The garage ceiling.  This picture also shows how the exterior wall insulation looks.  It's a plastic sheet, then they punched holes in it and blew in some sort of cellulose fill.  It's pretty cool.  Interior walls have the regular pink batting.  The insulators also sprayed foam in any cracks to seal the house up really well.  Joints on plywood, electrical boxes.  They were pretty thorough.