Showing posts with label doors. Show all posts
Showing posts with label doors. Show all posts

Monday, January 21, 2013

Finish Carpentry

Master Closet.

 Cubbies in the master closet.  The other closets are all done or nearly done, but it was too dark to get good pictures of them.

Kyle has been painting the garage- just with one layer of primer, nearly done.


Interior doors and trim work.  Most of the trim is simple, but upstairs we should have some that are a little fancier- we noticed that the finish carpenters put the basic stuff up there too, so hopefully we get it fixed.

Basement hallway-all the doors in place are making it seem so much more real.


 The lower section of stairs has the new treads and risers.

Tuesday, November 20, 2012

Rock and Stuff

It doesn't seem like anything major is happening right now, but the little things continue to move along.  Here's what's going on right now...

Kyle is still working on the electrical.  It's taking a long time, but he's plugging away at it.  I'm sure he'll be even happier when it's done than I will be.  

The support for the fireplace is in.  Kyle also framed inside of it, it will be a  second small closet of sorts for A, since his room has the smallest closet.  The support will have a slab poured over it.  Then we'll wait until we sell our old house to actually put the fireplace in.  That will be really nice.

I love my front door...

The gas lines are all run.  We have a gas water heater and dryer and this gas line for the cooktop, and a gas line run to the patio for the BBQ grill.

The rock is getting close to being done. 

Close up of the rock- this is the east side of the house.  

Kyle put some supports down through the floor into the joists so that when he builds the stair railings, they're sturdy.

The trench for the water line got filled in, so we're waiting for one more utility to come and lay their line, then we'll be ready for the driveway (although I think we have to get the drywall delivered before we can pour the driveway, and we need to get the electrical done and have the 4-way inspection, and the insulation done before the drywall can come, so hopefully all that stuff happens soon while we have such nice weather.