Showing posts with label utilities. Show all posts
Showing posts with label utilities. Show all posts

Saturday, June 1, 2013

Carpet and HVAC (and fridge)

The missing bathroom vanity got installed.  Now we're ready for those countertops, any day....


We were trying to pick a carpet that would go with gray tones in the basement, and brown tones upstairs (although really it's just the carpet on the stairs, in E's room and our closet, everything else is tile).  We picked a grayish carpet that had brown flecks in it, when I saw it outside in the truck the carpet guy brought it in, I thought it was UGLY.  It looks much better in.  

Carpet on the stairs (yes, that is painters tape on there still...).


 Carpet in J's room


Carpet in the family room.  


Return air vent covers installed.


Air conditioner.


Floor vents.


Toe kick vents.


Fridge!  Kyle also put the washer and dryer in the laundry room, but we didn't take a picture.


Ceiling vent in A's room.


Kyle did these awhile ago, but I hadn't noticed them until recently.  These are little lights in the study nook's in J's and A's rooms.  There will be a built in desk with shelves above at some point in the future.


We could not find the cover for this, luckily the HVAC guy found it by the furnace.  This is our heat exchange unit, it brings fresh air into the house and transfers the heat/cold from the old air to the new air.  Or something like that.



Wednesday, May 29, 2013

Stuff.

With Kyle being gone the last two weeks, a lot of the house progress felt a bit on standstill.  A little work was done on the cement out front (as you'll see later in this post), but not a lot.  However, he's back now and things seem to be coming together (fingers crossed).

I heard from the carpet guy that he'd be here on Wed (today), yesterday, so last night I went out to mop and sweep and vacuum and get the place cleaned up so we wouldn't trash our brand new carpet quite so fast.  I also bought door mats.  

Several friends came over and helped- I am so sore today, I hope everyone else faired better.  Thanks to great friends for helping out, especially the kids who got busy and did some great work.  P vacuumed up all the dirt piles, and L climbed in the tiny space under the stairs to sweep it out.  They were great.

Now on to the photos.

Back door.  I'm going to call this my Mom door, so "Welcome" mom (and dad).  I'm hoping my mom (and dad) use it regularly since it's a fairly straight shot from their backyard to ours.  I did sweep most of the back porch off, although it still has a lot of construction stuff and cardboard boxes that need to be disposed of before I can really sweep it all.


Front porch mat.  I also swept and cleaned up most of the construction debris from the front porch.  It's huge, so we'll have to find some nice chairs to sit in while we watch the neighbor's chickens run around.


The plumbers came today:  Hall bath toilet.


Hall bath shower.


Master shower.  The toilet is also installed in this bathroom too, but it looks the same as the other one.  We went with the Toto Eco Drake.  Toto toilets are great, and rarely plug.  Great for our four boys.  :)


Front porch steps and planters.  We need some window wells of some sort around the vents to the under porch storage room, and they need to put in a cement wall between the two levels so the dirt can fill in to the tops of the beds, but it's getting close. The little holes in the cement are boxes connected by conduit for Kyle to run wires so we have lighted steps.  That might be awhile coming, but it's going to be really neat.



This picture is from last week, I just forgot to take a new picture today.  


Here's one going the other direction, you can see how the edge of the driveway will curve around.  We've already decided we're only putting grass in the backyard, so I'm already picturing how we'll fill this in with plants and mulch.  Give me ten years and it will be beautiful.


Back inside- here's the kid's tub/shower and toilet.


Here are the plumbers installing the water heater.


Today we also went to the city building and signed the paperwork to get our water connected, and our garbage and recycling cans delivered.  The carpet pads got delivered today, but there was a problem with getting the carpet to the house today, so the carpet guy decided to cut it at the store and then bring it back tomorrow, early (fingers crossed, again).  

The countertops are also supposed to come tomorrow, then the plumbers can finish installing all the fixtures.  We're still missing one cabinet in the master bath, but apparently they can put the counter in first.  (This doesn't make sense to me, but I'm going to let someone else worry about it.)

Hopefully tomorrow I have another exciting update.  We're getting so close.

Tuesday, November 20, 2012

Rock and Stuff

It doesn't seem like anything major is happening right now, but the little things continue to move along.  Here's what's going on right now...

Kyle is still working on the electrical.  It's taking a long time, but he's plugging away at it.  I'm sure he'll be even happier when it's done than I will be.  

The support for the fireplace is in.  Kyle also framed inside of it, it will be a  second small closet of sorts for A, since his room has the smallest closet.  The support will have a slab poured over it.  Then we'll wait until we sell our old house to actually put the fireplace in.  That will be really nice.

I love my front door...

The gas lines are all run.  We have a gas water heater and dryer and this gas line for the cooktop, and a gas line run to the patio for the BBQ grill.

The rock is getting close to being done. 

Close up of the rock- this is the east side of the house.  

Kyle put some supports down through the floor into the joists so that when he builds the stair railings, they're sturdy.

The trench for the water line got filled in, so we're waiting for one more utility to come and lay their line, then we'll be ready for the driveway (although I think we have to get the drywall delivered before we can pour the driveway, and we need to get the electrical done and have the 4-way inspection, and the insulation done before the drywall can come, so hopefully all that stuff happens soon while we have such nice weather.